dc.descriptionOption : Hydraulique urbaineen_US
dc.description.abstractLe présent mémoire de fin d’études porte sur un projet d’alimentation en eau potable de la commune de Boudjellil, située dans la wilaya de Béjaïa. Après une analyse approfondie des caractéristiques du site, les besoins en eau de la population à l’horizon 2055ont été estimés à 11521,77 m³/j. Une vérification des capacités des ouvrages existants a été réalisée, suivie de la conception de réservoirs supplémentaires afin de répondre à la demande future. Le dimensionnement des conduits d’adduction par refoulement ainsi que de plusieurs conduites gravitaires a été effectué, accompagné du choix d’un système de pompage adapté pour les stations de reprise. L’étude du phénomène du coup de bélier a mis en évidence des pressions admissibles sur la majorité du réseau, à l’exception de deux tronçons pour lesquels l’installation de ventouses a été proposée comme solution de protection. Par ailleurs, un système d’information géographique (SIG) a été utilisé pour l’ensemble du projet, à travers l’exploitation de plusieurs logiciels tels que Google Earth, Global Mapper, AutoCAD, EPANET et QGIS. This final year project focuses on a drinking water supply project for the commune of Boudjellil, located in the wilaya of Béjaïa. After a detailed analysis of the site’s characteristics, the water needs of the population by the year 2055 were estimated at 11,521.77 m³/day. An assessment of the capacities of existing infrastructures was conducted, followed by the design of additional reservoirs to meet future demand. The sizing of the pressurized supply pipelines as well as several gravity pipelines was carried out, along with the selection of a suitable pumping system for the booster stations. The study of the water hammer phenomenon revealed acceptable pressure levels throughout most of the network, except for two sections where the installation of air valves was proposed as a protective solution. Additionally, a Geographic Information System (GIS) was used throughout the project, utilizing several software tools such as Google Earth, Global Mapper, AutoCAD, EPANET, and QGISen_US
dc.language.isofren_US
dc.publisherUniversité A. Mira de Bejaiaen_US
dc.subjectAlimentation en eau potable : Réservoirs : Adduction, pompes : Coup de bélieren_US
dc.titleModèle de SIG - AEP de la commune de Boudjellil, wilaya de Bejaiaen_US
dc.typeThesisen_US
Appears in Collections:Mémoires de Master

Files in This Item:
File Description SizeFormat 
Modèle de SIG – AEP de la commune de Boudjellil, wilaya de Bejaia.pdf7.13 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.